How to choose: answering the main questions
What distinguishes a SCADA server from an office server?
Full redundancy: dual power supplies on different circuits, RAID1/10, ECC memory, IPMI for remote diagnostics. Plus compatibility with industrial software, which often requires specific versions of Windows Server and SQL.
Where to install: in a workshop or a server room?
Server — in a server room or rack with filtration and climate control; for the workshop floor — thin clients and panel PCs. If you don't have a server room, we can assemble a dust-proof solution.
Dispatch center redundancy?
Hot standby: a second server with replication, switching in seconds. For MES and process history — a DBMS cluster. We design for the required availability class.